The point where work gets scattered
“Can you approve the posts?” is difficult to answer when several drafts and calendars circulate. An ambiguous reply can become mistaken permission to publish a different version.
Identify material without ambiguity
Use a stable batch reference and list its assets. State proposed channels and dates, using only a sharing location the recipient is authorized to open.
- Name visual and caption versions together.
- Highlight facts, dates and claims needing attention.
- Exclude unresolved assets or clearly mark them pending.
Ask for an explicit decision
Offer clear responses: approve the named batch or request numbered changes. Ask one reviewer to combine comments and explain how a late decision affects planning.
- Give a real deadline and timezone where relevant.
- Request comments against post references.
- Get approval of revised material when changes occur.
- Treat missing approval as pending and discuss new dates.
Approval message review checklist
Inspect references before sending. The request must identify the material actually being reviewed, rather than an earlier folder or superseded draft.
- Assets and captions are readable.
- Batch, channels and dates match.
- Claims have a responsible reviewer.
- Decision and deadline are explicit.
- The message implies neither silence-as-approval nor existing publication.
The working template
Use the complete text below, or download the text file and edit it in your preferred document editor.
Subject: Review [batch/version] for [period] Hi [name], Please review [batch/version] at [approved sharing reference]. It contains: • [post ID — visual version — caption version — channel — proposed date] • [repeat for each item] Please check [facts, offer dates and claims] as well as the overall material. By [date, time, timezone], please reply with either: 1. “Approved: [exact batch/version] for [channels and dates]”; or 2. A combined change list using the post IDs. [Items] remain pending and are excluded from this request. If changes are needed, I will send a revised version for review. If the decision is late, we will confirm new dates rather than assume approval. Open question: [question, or none]. Thanks, [sender] Decision record: [reviewer; version; response; date]Download text template
A filled example
Fictional example for illustration. Replace its facts and amounts with the details you actually agree.
FICTIONAL FILLED EXAMPLE Subject: Review Brookside September batch A-v2 Hi Pat, please review batch A-v2 in our approved folder. It contains BS-01 through BS-04, each with image v2 and caption v2, proposed for both agreed channels on 2, 5, 9 and 12 September. Please check plant names, prices and collection hours. By 28 August at 3:00 p.m. Eastern time, reply “Approved: A-v2 for the listed channels and dates,” or send one combined change list using post numbers. BS-05 is waiting for a confirmed photograph and is excluded. Requested changes will return as a revised batch for approval. Late approval means we agree new dates. Thanks, Lena. The decision record stays pending until Pat responds. This example does not represent actual approval or publication; sending the request itself is not consent to post the material.
Keep the context with the conversation
Prepare the request in Bankeiz Messages using batch details and chosen context. Check files and final wording before sending; an approval draft is not a publication action.
Understand your Twin · See Business access and metered AI usage